Project case study
Marvel Loch underground road base and stemming.
30,000 tonnes of underground road base and stemming aggregate co-produced in a single Marvel Loch crushing campaign. Three engineered products from one circuit.
Project overview
Underground road base and stemming aggregate co-produced from a single circuit. Three engineered outputs, one mobilisation. Standard requirement for an underground gold operation: road base for the decline, stemming for blast holes, fines as a co-product. The crew configured the train to hit all three specs from one feed source.
Scope of works
- Mobilisation of crushing train to a Marvel Loch underground operation
- Train configured for three concurrent product outputs from a single feed source
- Underground road base production at +20mm to -50mm spec
- Stemming aggregate production at +10mm to -20mm spec
- -10mm fines stockpiled as a co-product for ancillary use
Outcomes
- 30,000 tonnes produced across three engineered products
- Single mobilisation efficiency for underground operation supply
- Foundation for similar three-product campaign approaches across other WA gold sites

Related projects.
More work in this category.
Underground supply work fits inside Elite's broader mobile crushing capability across gold mining sites in WA.
Underground supply campaign coming up?
Tell us your road base and stemming specs and we'll size a single train to produce both.
Get a quote

